Future trends of water environment governance Outlook The whole life cycle, the whole basin governance

Nowadays, many governments give an urban river section to corporate governance. As an enterprise, BEWG hopes to work hard on two "all-encompassing" watershed governance and life cycle control. The whole basin involves water source areas, rural areas and urban areas, and it is unlikely that all of them will be systematically solved in engineering. But businesses can make protective plans in water sources. The management of non-point source pollution in rural areas can be planted and adjusted from aspects of farming, irrigation patterns and planting structure so as to reduce part of the pollutants.

The whole life cycle runs through the planning and design to the end of operation and management. In the management of the front, planning and design should have the top design. To this end, during the planning and design phase, BEWG has established a top-level design team that includes urban planning, watershed management, hydrology, water quality modeling, project management and operations management. The top-level design must set all the important parameters of the planning, set out the parameters and indicators into the design unit, which became a module, and then specifically to the Design Institute to achieve.

In the process of building a dynamic adjustment mechanism. Because the construction of a lot of changes. Therefore, the top-level design team will follow the construction process to dynamically adjust parameters at any time, and look for remedial projects to solve the problem. In addition, during the construction process, material and equipment selection will be greatly different from the traditional construction mode. The materials are no longer the cheaper the better, but are based on durability and reliability during operation.

To the operational phase, the core content is the operation of the technology. The traditional water environment management and operation are mostly surface cleaning, greening, cutting grass, cleaning the pavement, etc., and lack of technical content. In fact, BEWG has used many water environment models in the design process and has been dynamically adjusted along with the construction process. When adjusted to the operational phase, the water environment model will be used as the operational phase of the operational model, so that transport will be very technical content. For example, in the water environment unit with pipe network, wastewater treatment plant and river channel as its core, the operation standard of wastewater treatment plant can be completely controlled according to the water quality of the receiving water body, which can greatly reduce the operating cost of the wastewater treatment plant.