2019年4月12日星期五

High yield pepper management program

1. Colonization management
Apply 3000kg of fully ripe high-quality farm manure + 40kg of marathon vegetable fertilizer/mu ditch fertilizer per mu.
2. Removing and sealing before transplanting: in order to effectively prevent weeds in the field, the herbicide should be selected according to the soil preparation, rake and grind, and used for sealing.According to the mu, use "ethyl oxalamide" active medicine 100-120ml or 33% "field tonic" active medicine 150-200ml, add water 40kg, evenly spray, shallow rake 4-6cm, soil sealing, main control grass weeds and some broadleaf weeds.
3. Timely implantation: the implantation shall be carried out on consecutive sunny days of no less than 3 days, and the implantation shall be watered in time after implantation;After 3 ~ 5 days, water the seedlings slowly.Door pepper sit, each acre of top dressing ai can be collected 20-20-20+TE3 ~ 5 kg.In accordance with the principle of "one harvest and one fertilizer application", aike can be used for 20-20-20+TE 2 times in normal conditions, 15-6-35+TE once in rotation, and root bovine amino acid water soluble fertilizer is added for 4L/ mu/time when the plant grows badly.The amount of watering should be large when transplanting, and the principle of less watering and frequent watering should be adopted in the later stage to prevent the excessive amount of water from causing the retting.
4. Flower and fruit preservation: in the flowering stage, foliar surface is sprayed with nutritrium phosphate, potassium, hydrogen and potassium at 100 ~ 150g/ mu to supplement nutrition.

没有评论:

发表评论